IN CLOSING

CONCLUSION
  • From looking at the data there was a common pattern:

    • Sand with in the wall was getting sucked out from the center which created sand deposits on the sides of the wall

    • Dirt and grass seemed to hold

Read More
DATA COLLECTED

FINDINGS!

The wall of the Loko Ea fishpond site has started to collapse and by doing this investigation I was hoping to figure out what exactly was helping the wall and what the wall did not need.

PROJECT BENEFITS

Maintain a strong structure

  • Easy for younger volunteers to do

  • Track progression to see what is happening to the wall

Measuring the strength of the fishpond:

  • Great way to track how well a pond structure 

  • Tracking progress by using a table will be easy to teach and will be quick.

  • Set transects in key areas that provide enough area for analyzing.